A 148 kW System, installed March, 2010

  • 148.4 KW System
  • 546 Sharp 216 Watt Polycrystalline Panels
  • 252 Sharp 151 Watt Thin Film Panels
  • Completion Date: March 2010

ten1

Sharp's Memphis facility assembles the polycrystalin modules installed on the roof.

ten2

Sharp Thin-film modules installed on Unirac Rapidrack racking. 

ten3

The system will produce over 185,000 kWh, enough electricity to power 16 homes for 30 years.

ten4

Polycrystalline modules installed on Sharp's custom racking system.  The system is almost entirely Tennessee materials.  When installed it was the largest installation in the State.